|
Material List
|
|
Quan
|
Part #
|
Description
|
|
24
|
HBA
|
Hurri-Bolt Anchors
|
|
4
|
HBE
|
Hurri-Bolt Epoxy Stud
|
|
1
|
HB10
|
10oz. Hurribolt Epoxy
|
|
28
|
HBSS
|
Hurri-Bolt Square Sill Washer
|
|
56
|
HBN
|
Hurri-Bolt 1/2" NC Nut
|
|
49
|
HBR
|
Hurri-Bolt 6' Double-End Studs
|
|
77
|
HBC
|
Hurri-Bolt Couplers
|
|
28
|
HBT
|
Hurri-Bolt 6' All Thread Top Rods
|
|
28
|
HBST
|
Hurri-Bolt Square Top Plate Washer
|
|
NO
STRAPS OR STRAP NAILS BELOW THE TOP PLATE!*
|
*Most
Cases. A combined uplift and shear load analysis should be done to determine
if additional sill plate anchors are required.
Spacing determined by the uplift resistance requirement
for your structure and rigidity of wall sheathing materials and framing.
|
|
Hurri-Bolt
Top Plate Capcities
|
|
SYP
Top Plates, (Fc) = 565 psi
|
|
Square
Washer Size
|
2.00
|
2.50
|
|
Rod
Size (in.)
|
Hole
Diam.(in.)
|
(lbs.
Uplift)
|
(lbs.
Uplift)
|
|
1/2
|
9/16
|
2522
|
3900
|
|
Hurri-Bolt
Tie-Down Capacities per Truss
|
|
(S-Y-P
Top Plate, Trusses @ 24" Spacing)
|
|
Rod
Size
(in.)
|
Washer
Size
(in.)
|
Rod
Spacing
|
|
48"
|
64"
|
72"
|
|
(lbs.
Uplift)
|
(lbs.
Uplift)
|
(lbs.
Uplift)
|
|
1/2
|
2"
|
1261
|
945
|
840
|
|
1/2
|
2-1/2"
|
1950
|
1462
|
1300
|
|